MiTower Weekly Hire
- Unbeatable Prices
- Hire Now
- Backordered, shipping soon
The MiTower scaffold tower is the ultimate solution for quick and efficient access at heights of up to 6m working height (4m platform height). Designed for single-person assembly, this compact tower eliminates the need for additional labour, making it a cost-effective and time-saving option for small to medium-sized projects. With a footprint of just 1.37m in length and 0.73m in width, the MiTower is ideal for use in tight spaces, such as hallways, domestic settings, or commercial interiors. Its lightweight aluminium construction ensures portability without sacrificing stability or safety.
Despite its compact design, the MiTower is built to rigorous safety standards, including EN1004 compliance. It features anti-slip platforms, locking castor wheels, and guardrails to provide maximum security during use. The tower’s innovative base doubles as a trolley, allowing all components to be easily transported when disassembled. This unique feature streamlines setup and teardown, making the MiTower a favourite for tradespeople and DIY enthusiasts alike. Order now for next-day delivery and experience the convenience of the MiTower for your next project.
At SAB Supply, we strive to make the delivery and collection process as smooth and efficient as possible. Here’s everything you need to know about how it works:
Delivery Process:
- Selecting Your Delivery Date: When placing your order, you’ll choose a requested delivery date at checkout. Delivery and Collection is completely free anywhere in the UK.
- Local Delivery: Once your order is placed, we arrange it with the closest local depot that has stock available for your chosen date.
Day of Delivery:
- Delivery Location: All deliveries are kerbside only. Drivers are not permitted to enter properties or back gardens for insurance reasons; however, they can deliver to a driveway or front garden.
- Signing for Delivery: Someone must be present to sign for the delivery, as drivers are unable to leave the equipment without a signature.
Collection Process:
- Hire Period End: The day before your hire period ends, we will contact you to confirm if you’re ready for collection or need to extend the hire.
- Arranging Collection: If collection is required, we’ll notify your local depot, who will aim to collect the next day. Delays are always a possibility and may occur due to busy schedules, traffic issues or driver absence.
- Responsibility for Equipment: Please note that the equipment remains your responsibility until it is collected.
- Collection Location: As with deliveries, all collections must be kerbside. Drivers cannot enter properties or back gardens to retrieve equipment in case they damage anything whilst transporting the kit back and forth.
Abortive Transport Charges:
If a delivery or collection cannot be completed due to the following reasons, we must apply an abortive transport charge of £12.50 + VAT (£15):
- Nobody is available to sign for the delivery or collection.
- The driver is unable to contact you via phone.
- The equipment is not kerbside and accessible for collection.
We appreciate your understanding and cooperation to ensure a smooth process for both deliveries and collections. Should you have any questions, feel free to contact our team for assistance!
The MiTower is an innovative one-person assembly scaffold tower, designed for fast and hassle-free setup. With its compact design and lightweight components, it’s easy to transport and assemble without needing additional tools or assistance. For step-by-step guidance, you can access the full instruction manual here.