Yellow GRP scaffold tower with stabilisers, castors and integrated ladder
SAB Supply Scaffold Tower Guide

GRP Scaffold Tower Weekly Hire

Choose your tower height to view your weekly hire price.
Does not change the hire price.
Does not change the hire price.

Tower height guide

Select a tower height above to see the platform height and approximate reach.

Not sure which tower you need? FIND MY TOWER
How many towers do you need?Number of separate physical towers.
1 tower
Initial hire periodChoose your initial hire period — this can be extended later if needed.Choose your initial hire period — this can be extended later if needed.
1 week
Free Delivery & CollectionOn scaffold tower hire across the UK
Next-day availabilityFast nationwide service, subject to availability
Trusted since 2011Over 15 years of experience
Real UK supportSpeak to our friendly team

GRP TOWER HIRE

GRP scaffold tower hire made simple

Choose a GRP scaffold tower when you need a practical working-at-height solution for environments where aluminium may not be suitable. Manufactured using glass-reinforced plastic, GRP towers are non-conductive and are commonly chosen for electrical, industrial, rail and specialist maintenance work. Choose your required height, width, platform length and initial hire period above, then add your configured tower to the basket. Delivery and collection are arranged nationwide, with next-day service subject to availability. If you’re unsure which setup suits your job, use Find My Tower or speak to the SAB Supply team before ordering.

  • Non-conductive GRPDesigned for environments where electrical conductivity is a concern.
  • Single or double widthChoose the footprint that suits your site.
  • Multiple platform lengths1.8m or 2.5m working area.
  • Nationwide hireDelivery and collection arranged across the UK.

CHOOSE YOUR SETUP

Choose the right GRP tower for your job

Electrical installation and maintenance

A non-conductive access solution for electrical installation, maintenance and similar environments.

Specialist environments

Well suited to jobs where aluminium access equipment may be unsuitable, including rail, utilities and industrial environments.

Not sure what fits?

Use Find My Tower to help narrow down suitable options based on height, access and working space.

FIND MY TOWER

AT A GLANCE

GRP tower specifications

Tower typeGRP / fibreglass scaffold tower
Available handrail heights3.2m / 4.2m / 5.2m / 6.2m / 7.2m / 8.2m / 9.2m
Single width0.93m
Double width1.53m
Platform lengths1.8m / 2.5m
Safe working load per platform225kg
Maximum tower load900kg
StandardBS EN 1004-1:2020

Always check the manufacturer's instructions and site conditions before assembly or use.

What is a GRP scaffold tower?

GRP stands for glass-reinforced plastic, commonly referred to as fibreglass. Unlike aluminium, GRP is non-conductive, which makes GRP scaffold towers particularly useful where electrical conductivity is a concern or where metal access equipment may be unsuitable. GRP is also resistant to corrosion and oxidation, making it suited to a range of specialist industrial environments. The exact tower design can vary between manufacturers, so always follow the instructions supplied with the equipment.

FROM ORDER TO COLLECTION

Free nationwide delivery & collection

01

Choose your tower

Select the configuration and hire period above.

02

Choose a delivery date

Tell us when you would like the tower delivered.

03

We arrange delivery

We arrange delivery to your site, home or workplace.

04

Collection arranged

Tell us when you are finished and we will arrange collection.

Good to know

  • Kerbside deliveryDrivers cannot carry equipment through properties.
  • Delivery timesETAs are normally available on the day of delivery.
  • Collection timingCollection may take a few days during busy periods.
  • Your responsibilityEquipment remains the hirer's responsibility until collected.

Delivery and collection are free nationwide for this GRP scaffold tower product. You select your requested delivery date, and next-day service is subject to availability. Local depots generally plan routes on the day of delivery, so SAB normally cannot provide an ETA in advance. Delivery is kerbside/front-access: drivers do not enter homes or buildings or carry components through properties to reach rear gardens. Rear delivery may be possible where the vehicle can directly access and park at the rear. Once SAB is told the tower is ready for collection, the relevant depot is instructed to collect it. Collection may take a few days during busy periods. The equipment remains the hirer's responsibility until it has physically been collected.

GRP tower assembly & instructions

Your GRP tower may be supplied from different manufacturers depending on local depot stock. Component designs and assembly sequences can vary, so always use the instructions for the exact make and model delivered. Towers must be assembled and used by a competent person in accordance with the relevant manufacturer's instructions. Delivery and collection drivers do not assemble or dismantle scaffold towers; this must be carried out by someone on site.

GRP tower hire FAQs

Choosing & using your tower

What does GRP mean and why choose it?

GRP stands for glass-reinforced plastic, often called fibreglass. The material is non-conductive and corrosion-resistant, making GRP towers particularly suited to electrical work and specialist environments where aluminium equipment may be unsuitable. Always follow the site requirements and instructions for the exact tower supplied.

Which tower width should I choose?

Choose single width at 0.93m for a more compact footprint or double width at 1.53m when you need a wider working area. Check the available site space before ordering.

What platform lengths are available?

This GRP range is available with 1.8m or 2.5m platform lengths.

What is the safe working load per platform?

The safe working load is 225kg per platform. This includes users, tools and materials placed on that platform.

What is the maximum tower load?

The maximum tower load figure is 900kg. This is separate from the 225kg safe working load per platform, and the tower must always be used within the limits stated in the instructions for the exact make and model supplied.

Do I need PASMA or other qualifications?

No qualifications or certificates are required simply to hire a scaffold tower from SAB Supply. The tower must still be assembled and used by a competent person. Some commercial sites, employers or site managers may require PASMA or other appropriate training, so check your own workplace and site requirements.

How do I choose the right tower height?

Use the tower height selector above, or visit Find My Tower for guided help based on your required reach and site conditions.

Do drivers assemble towers?

No. Drivers do not assemble towers. Someone on site must assemble the equipment in accordance with the correct manufacturer's instructions.

Hire, delivery & collection

Is a deposit required?

No. SAB Supply does not take a deposit for scaffold tower hire. Your hire charges are paid upfront when the order is placed.

Is delivery and collection free?

Scaffold tower hire includes free nationwide delivery and collection. Next-day service is subject to availability.

When will I receive a delivery ETA?

Local depots generally plan routes on the day of delivery, so SAB normally does not receive an ETA in advance. On the morning of delivery, you can contact SAB and the team can request an ETA from the depot. We cannot promise a specific delivery time.

Is delivery kerbside?

Yes. Delivery is kerbside/front-access. Drivers do not enter homes or buildings or carry tower components through properties to reach rear gardens. Rear delivery may be possible where the vehicle can directly access and park at the rear, depending on access.

Do drivers dismantle towers for collection?

No. The tower must be dismantled and ready for collection before the driver arrives.

What happens when the hire period ends?

Tell SAB when the equipment is ready for collection, or request an extension if you need more time.

How quickly will my tower be collected?

SAB notifies the local depot once the equipment is off-hired and collections are arranged as quickly as possible. Collection may take a few days during busy periods, so do not assume collection will occur the next day.

Who is responsible for the equipment until collection?

The equipment remains the hirer's responsibility until it has physically been collected by the depot.

Ready to hire your GRP scaffold tower?

Configure your GRP tower above or use Find My Tower to help narrow down a suitable setup for your job.

Free delivery & collection • Next-day service subject to availability • Trusted since 2011


Recently viewed