AGR Scaffold Tower Weekly Hire
- Unbeatable Prices
- Hire Now
- Backordered, shipping soon
Our Advanced Guardrail (AGR) scaffold towers combine practicality and safety, offering a streamlined assembly process that meets the latest working at height regulations. Ideal for professionals requiring quick and secure access to elevated areas, these towers feature a pre-fitted guardrail system that significantly reduces assembly time while providing robust fall protection. With handrail heights ranging from 3.2m to 13.2m, the AGR scaffold towers cater to projects of all scales, from routine maintenance to more complex construction tasks. Their versatility ensures suitability for both indoor and outdoor use.
Available in a range of configurations, the AGR towers are offered in 1.8m or 2.5m widths and 0.9m or 1.5m depths, making them adaptable to various working environments and space constraints. Built from lightweight yet durable aluminium, they are easy to transport, assemble, and dismantle while maintaining a high load capacity for workers and tools. Compliant with EN1004 safety standards, these towers ensure peace of mind on every job. With next-day nationwide delivery and competitive hire rates, our AGR scaffold towers are a must-have for projects requiring a focus on safety and efficiency.
At SAB Supply, we strive to make the delivery and collection process as smooth and efficient as possible. Here’s everything you need to know about how it works:
Delivery Process:
- Selecting Your Delivery Date: When placing your order, you’ll choose a requested delivery date at checkout. Delivery and Collection is completely free anywhere in the UK.
- Local Delivery: Once your order is placed, we arrange it with the closest local depot that has stock available for your chosen date.
Day of Delivery:
- Delivery Location: All deliveries are kerbside only. Drivers are not permitted to enter properties or back gardens for insurance reasons; however, they can deliver to a driveway or front garden.
- Signing for Delivery: Someone must be present to sign for the delivery, as drivers are unable to leave the equipment without a signature.
Collection Process:
- Hire Period End: The day before your hire period ends, we will contact you to confirm if you’re ready for collection or need to extend the hire.
- Arranging Collection: If collection is required, we’ll notify your local depot, who will aim to collect the next day. Delays are always a possibility and may occur due to busy schedules, traffic issues or driver absence.
- Responsibility for Equipment: Please note that the equipment remains your responsibility until it is collected.
- Collection Location: As with deliveries, all collections must be kerbside. Drivers cannot enter properties or back gardens to retrieve equipment in case they damage anything whilst transporting the kit back and forth.
Abortive Transport Charges:
If a delivery or collection cannot be completed due to the following reasons, we must apply an abortive transport charge of £12.50 + VAT (£15):
- Nobody is available to sign for the delivery or collection.
- The driver is unable to contact you via phone.
- The equipment is not kerbside and accessible for collection.
We appreciate your understanding and cooperation to ensure a smooth process for both deliveries and collections. Should you have any questions, feel free to contact our team for assistance!
Scaffold towers are designed for quick and straightforward assembly, making them accessible to anyone. They require no specialist tools or prior training, ensuring you can set up safely and efficiently on-site. For added convenience, you can access the full instruction manual here, providing clear, step-by-step guidance to help you get started with ease.