MiTower Plus Weekly Hire
- Unbeatable Prices
- Hire Now
- Backordered, shipping soon
The MiTower Plus offers all the benefits of the standard MiTower, with additional footprint and stability for more demanding access tasks. Designed for professional use, it provides a larger working platform while maintaining fast one-person assembly.
MiTower Plus Benefits
-
Increased footprint: Wider than standard MiTower
-
Increased Stability: Enhanced bracing and wider base
-
One-Person Assembly: No tools required
-
Compact & Transportable: Ideal for mobile trades
MiTower Plus Specifications
-
Platform Heights: Up to 4m allowing a 6m reach with your hands
-
Footprint (approx): 1.62m x 0.73m
-
Safe Working Load (SWL): 150kg
-
Standard Compliance: BS EN 1004-1:2020
Perfect For
-
Commercial maintenance
-
Lighting and HVAC installations
-
Site work requiring rapid repositioning
For heavy-duty, multi-person access, view our AGR or 3T scaffold tower hire ranges.
Nationwide MiTower Plus Hire
Hire your MiTower Plus from SAB Supply and benefit from free delivery, free collection, and industry-leading hire rates.
At SAB Supply, we strive to make the delivery and collection process as smooth and efficient as possible. Here’s everything you need to know about how it works:
Delivery Process:
- Selecting Your Delivery Date: When placing your order, you’ll choose a requested delivery date at checkout. Delivery and Collection is completely free anywhere in the UK.
- Local Delivery: Once your order is placed, we arrange it with the closest local depot that has stock available for your chosen date.
Day of Delivery:
- Delivery Location: All deliveries are kerbside only. Drivers are not permitted to enter properties or back gardens for insurance reasons; however, they can deliver to a driveway or front garden.
- Signing for Delivery: Someone must be present to sign for the delivery, as drivers are unable to leave the equipment without a signature.
Collection Process:
- Hire Period End: The day before your hire period ends, we will contact you to confirm if you’re ready for collection or need to extend the hire.
- Arranging Collection: If collection is required, we’ll notify your local depot, who will aim to collect the next day. Delays are always a possibility and may occur due to busy schedules, traffic issues or driver absence.
- Responsibility for Equipment: Please note that the equipment remains your responsibility until it is collected.
- Collection Location: As with deliveries, all collections must be kerbside. Drivers cannot enter properties or back gardens to retrieve equipment in case they damage anything whilst transporting the kit back and forth.
Abortive Transport Charges:
If a delivery or collection cannot be completed due to the following reasons, we must apply an abortive transport charge of £12.50 + VAT (£15):
- Nobody is available to sign for the delivery or collection.
- The driver is unable to contact you via phone.
- The equipment is not kerbside and accessible for collection.
We appreciate your understanding and cooperation to ensure a smooth process for both deliveries and collections. Should you have any questions, feel free to contact our team for assistance!
The MiTower is an innovative one-person assembly scaffold tower, designed for fast and hassle-free setup. With its compact design and lightweight components, it’s easy to transport and assemble without needing additional tools or assistance. For step-by-step guidance, you can access the full instruction manual here.